Tuesday, 15 September 2015

The Transactional Concurrency in Load testing


How many transaction will need to run per minute if a load test has to run for 2 hours with 5000 users, assuming average length of transaction if 5 minutes?

Solution:

Duration of load test -120 minutes
User load- 5000
Average Length of transaction- 5 minutes
No. of transaction per minute-?

No. of transaction performed by single user in 120 minute = 120 minutes / 5 minute = 24 transaction

No. of transaction performed in 2 hours by 5000 users = 5000*24 =120000 transactions.

No. of transaction per minute =No. of transaction performed during 2 hour by 5000 users/duration of two hour = 120000/120= 1000 Transaction /Minute

LoadRunner Training in Bangalore
LoadRunner Training in Hyderabad
LoadRunner Online Training
LoadRunner Training in BTM
LoadRunner Training in Marathahalli
Best LoadRunner Training Institutes in Bangalore 
Best LoadRunner Training Institutes in India
Training Institutes in Bangalore

No comments:

Post a Comment