Thursday 31 March 2016

What drawbacks do manual load tests have?

The manual load testing drawbacks are:
  • It is very expensive to do Manual Testing, as real users charge by the hour.
  • With manual load testing, load testing for longer durations like for 7 days won’t be possible, as users really work a maximum of eight hours daily.
  • You will not get accuracy for results correlation as there are delays between actions of users.
  • It is hard to do results collection as the results capture each other.
  • It is hard to do.

No comments:

Post a Comment